The challenge

A tight urban plot with no laydown area and a fixed crane window meant steel had to arrive sequenced for just-in-time erection.

Our approach

We modelled the full frame in Tekla, fabricated in erection sequence, and ran a barcoded dispatch schedule so each lift landed in order.

The result

Zero site rework on connections and a frame topped out two weeks ahead of the contract programme.

Project data

TONNAGE
2,400 T
FLOORS
22
PROGRAMME
34 weeks
GRADE
E350 / E450

Scope delivered

DetailingFabricationGalvanizingErection

Client · Confidential — developer

Location · Mumbai, IN

A molten metal pour throwing glowing orange sparks against a dark backdrop
START YOUR PROJECT

Have a drawing? Let's forge it.

Send us your drawings or a rough scope. We'll come back with a buildable quote, a programme, and a single point of contact.