// Warehousing & Logistics
Continental Logistics Park
Pre-engineered building frames for a 1.2 million ft² distribution park across six warehouse units.
TONNAGE
3,100 T
AREA
1.2 M ft²
SPAN
36 m clear
UNITS
6
YEAR
2023
The challenge
Six identical large-span units on an aggressive schedule demanded a repeatable, jig-driven fabrication flow.
Our approach
Standardised portal connections and welded built-up rafters in dedicated jigs let us run the units as a production line.
The result
Average of one unit's steel package fabricated and dispatched every three weeks, holding the site programme.
Project data
- TONNAGE
- 3,100 T
- AREA
- 1.2 M ft²
- SPAN
- 36 m clear
- UNITS
- 6
Scope delivered
DesignFabricationCoatingErection
Client · Confidential — 3PL operator
Location · Bhiwandi, IN