Pre-engineered building frames for a 1.2 million ft² distribution park across six warehouse units.

TONNAGE

3,100 T

AREA

1.2 M ft²

SPAN

36 m clear

UNITS

6

YEAR

2023

A large steel structural framework with strong light-and-shadow contrast

The challenge

Six identical large-span units on an aggressive schedule demanded a repeatable, jig-driven fabrication flow.

Our approach

Standardised portal connections and welded built-up rafters in dedicated jigs let us run the units as a production line.

The result

Average of one unit's steel package fabricated and dispatched every three weeks, holding the site programme.

Project data

TONNAGE
3,100 T
AREA
1.2 M ft²
SPAN
36 m clear
UNITS
6

Scope delivered

DesignFabricationCoatingErection

Client · Confidential — 3PL operator

Location · Bhiwandi, IN

A molten metal pour throwing glowing orange sparks against a dark backdrop
START YOUR PROJECT

Have a drawing? Let's forge it.

Send us your drawings or a rough scope. We'll come back with a buildable quote, a programme, and a single point of contact.