// Energy & Power
Thermal Power Plant Structures
Heavy structural steel, pipe racks and equipment supports for a thermal power plant balance-of-plant package.
TONNAGE
4,200 T
PIPE RACKS
6 corridors
GRADE
E350 / E450
PROGRAMME
40 weeks
YEAR
2022
The challenge
Dense pipe-rack steel with heavy moving loads and strict EPC interface tolerances across multiple corridors.
Our approach
Tight model coordination with the EPC, staged fabrication by corridor, and trial assembly of complex nodes.
The result
Interface clashes resolved in the model, not on site — keeping the BOP erection front moving on schedule.
Project data
- TONNAGE
- 4,200 T
- PIPE RACKS
- 6 corridors
- GRADE
- E350 / E450
- PROGRAMME
- 40 weeks
Scope delivered
DetailingFabricationGalvanizingErection
Client · Confidential — EPC contractor
Location · Nagpur, IN
START YOUR PROJECT
Have a drawing? Let's forge it.
Send us your drawings or a rough scope. We'll come back with a buildable quote, a programme, and a single point of contact.