Thermal Power Plant Structures

Heavy structural steel, pipe racks and equipment supports for a thermal power plant balance-of-plant package.

TONNAGE

4,200 T

PIPE RACKS

6 corridors

GRADE

E350 / E450

PROGRAMME

40 weeks

YEAR

2022

A worker silhouetted against the fiery glow of molten metal at a plant

The challenge

Dense pipe-rack steel with heavy moving loads and strict EPC interface tolerances across multiple corridors.

Our approach

Tight model coordination with the EPC, staged fabrication by corridor, and trial assembly of complex nodes.

The result

Interface clashes resolved in the model, not on site — keeping the BOP erection front moving on schedule.

Project data

TONNAGE
4,200 T
PIPE RACKS
6 corridors
GRADE
E350 / E450
PROGRAMME
40 weeks

Scope delivered

DetailingFabricationGalvanizingErection

Client · Confidential — EPC contractor

Location · Nagpur, IN

A molten metal pour throwing glowing orange sparks against a dark backdrop