Harbour Road Bridge
Fabrication of welded steel plate girders for a four-lane road bridge, including camber and bolted field splices.
TONNAGE
1,650 T
SPAN
3 × 45 m
GIRDERS
welded plate
NDT
100% UT welds
YEAR
2023
The challenge
Deep welded plate girders required tight control of camber, distortion and full-penetration weld quality.
Our approach
Sequenced welding with pre-set camber on assembly beds and 100% ultrasonic testing of critical welds.
The result
All girders passed third-party inspection first time, with field splices bolting up to survey on site.
Project data
- TONNAGE
- 1,650 T
- SPAN
- 3 × 45 m
- GIRDERS
- welded plate
- NDT
- 100% UT welds
Scope delivered
FabricationNDTMetalisingDelivery
Client · Confidential — infrastructure authority
Location · Kochi, IN
START YOUR PROJECT
Have a drawing? Let's forge it.
Send us your drawings or a rough scope. We'll come back with a buildable quote, a programme, and a single point of contact.